River Orco (Feletto) – Reconstruction of bridge

Client

Province of Turin

Year

2003

Work amount:

€ 5.003.012,50

Reconstruction of bridge over the river Orco at Feletto. Complete design, Works Management, structural works, Safety coordination.
Reconstruction of bridge partially collapsed following the events that occurred after the flood of October, 2000, and variations have been necessary to the structural and architectural recuperation of the existing arched masonry bridge; for the new bridge has been adopted a caisson light structure in pre-stressed concrete, with three beams of maximum 56 metres.

Gallery